The Gulf railway project that links Gulf Cooperation Council (GCC) member countries will be completed and operating by 2018, said the GCC Secretariat General. The project with a total cost of more than $15.4 billion will have a total length of 2,117 km and links Kuwait City and passes through GCC countries all the way to Muscat. It also includes the link between Bahrain and Saudi Arabia by a bridge. It said the passenger trains’ speed will be 220 km/hr, while cargo trains will be between 80-120 220 km/hr, with the use of diesel to generate power.
Latest article
Al Molla inspects the Suez Methanol Derivatives Plant in Damietta
Minister of Petroleum and Mineral Resources Tarek Al Molla has inspected the construction work of the Suez Methanol Derivatives Plant in Damietta...
Petroleum Marine Services Company (PMS) Profits increase 28% in 2023
Minister of Petroleum and Mineral Resources, Eng. Tarek El Molla has attended remotely the general assembly of Petroleum Marine Services Company (PMS) which...
Misr Maintenance Company achieves EGP 8.8 bn revenues
The General Assembly of the Misr Maintenance Company was held on Sunday, March 31, where the results of the company’s work for...